Abstract:
The particulate matter of the exhaust cylinder of the water-soluble phosphate fertilizer plant of a phosphate fertilizer plant in Yunnan province exceeds the corresponding implementation standard. Through the monitoring, investigation and analysis of each point,the cause was identified. By optimizing the operation process and increasing the treatment facilities, the exhaust gas emission reached the standard after the implementation, and then the feasibility of the exhaust gas treatment optimization measures was verified.