基于水质目标管理的污染负荷总量控制方案研究——以滇池流域为例

Research on Total Pollution Load Control Scheme based on Water Quality Target Management——Take the Dianchi Lake Basin as an Example

  • 摘要: 围绕湖泊水质目标管理,提出以流域污染控制指标作为总量分配的控制因子,按河-湖水质响应的重要性,考虑湖泊子流域污染控制基础条件差异、污染源削减潜力差异,对各子流域实施差异化的管控策略。并对湖泊水环境容量、污染负荷核算及预测、削减控制指标及总量控制方案、方案达标验证及修正等方法开展研究,形成一套“总量削减控制目标→流域污染控制指标→总路削减任务分配方案→达标验证及方案修正”的湖泊流域污染负荷总量控制方案研究方法体系,实现了流域污染控制指标体系、污染负荷总量控制方案、入湖河道水质管控与湖泊水质目标管理的系统联动结合,可提升湖泊水质目标管理方案的科学性和可操作性。基于该方法体系,以滇池为例,对2025年滇池流域污染负荷总量控制方案开展研究。研究结果表明,通过该方法体系确定的滇池流域水质目标管理方案能较好的满足湖泊水质目标达成,该方法体系可应该于其它湖泊的水质目标管理方案制定。

     

    Abstract: The scientific water quality target management plan is of great significance for lake governance. Focusing on the lake water quality target management, it is proposed to take the river basin pollution control index as the control factor for the total allocation according to the importance of the river-lake water quality response.The basis for pollution control in the lake sub-basin was considered. Different conditions and pollution source reduction potential differences would implement differentiated management and control strategies for each sub-basin. The research on lake water environment capacity, pollution load accounting and forecasting, reduction control indicators and total amount control plan, program compliance verification and correction, etc. would be done in order to form a set of "total reduction control goals → river basin pollution control indicators → general road reduction". The research method system of the total pollution load control scheme in the lake basin was based on the task allocation scheme → compliance verification and scheme revision”, which could realize the system of the basin pollution control index system, the total pollution load control scheme, the water quality management and control of the rivers entering the lake, and the lake water quality target management system. The linkage and combination could improve the scientificity and operability of the lake water quality target management plan. Based on this method system, taking Dianchi Lake as an example, the research on the total pollution load control plan of the Dianchi Lake basin in 2025 was carried out. The research results showed that the water quality target management plan of the Dianchi Lake Basin determined by this method system could better meet the lake water quality target, and the method system should be formulated in the water quality target management plan of other lakes.

     

/

返回文章
返回