污染地下水抽提修复技术工程应用分析

Analysis of Engineering Application of Contaminated Groundwater Extraction and Remediation Technology

  • 摘要: 以上海某工业场地修复工程为案例,通过对比单井抽提、多井同时抽提和多井循环抽提等方式,研究其对抽水效果的影响,根据现场水处理中试选取最佳药剂投加比,可为地下水抽提工程设计提供依据。同时对污染地下水抽提修复施工过程进行案例分析,经过抽提修复处理后A、B区污染地下水砷浓度在45 d内达到修复目标值,C区污染地下水污染物在70 d内达到修复目标值,经效果评估确认修复达标。最后针对抽提修复的实际应用的问题和后续技术发展方向进行讨论和建议。

     

    Abstract: This paper took an industrial site remediation project in Shanghai as a case study. Comparing the single well pumping, multiple wells at the same time pumping and multiple wells cyclic pumping, etc., the effect on the pumping effect was studied according to the field water treatment pilot selection of the best pharmaceutical dosage ratio of the wastewater treatment, which could be used as a basis for the design of the groundwater pumping project. In the meantime, the polluted groundwater pumping remediation construction process case study was analysed after pumping remediation treatment A & B area of contaminated groundwater arsenic concentration in 45 days to reach the target value of the remediation, C area of contaminated groundwater pollutants in 70 days to reach the target value of the remediation.The effect of the assessment confirmed that the remediation of the standard. Finally, the problems of practical application of extraction remediation and the direction of subsequent technological development are discussed and suggested. This paper could provide a reference for the application of other extraction remediation technologies in groundwater contamination remediation.

     

/

返回文章
返回